Skip to main content

Blog

SEGA M Engineering Blog

Guides from the factory floor

Practical guides written by the engineers who design, build and test our switchboards, enclosures and LED lighting in 10th of Ramadan City, Egypt. Standards explained plainly, checklists you can use on your next project.

Technician fitting busbar connections in distribution boards at the SEGA M factory Latest guide · Switchboards

Fishbone Distribution Boards: How the Busbar Works and When to Use One

A fishbone board replaces dozens of loose wires with one busbar system that feeds every MCB. Here is how it works, where it beats a conventional board, and what to put in the specification.

14 Nov 20267 min read Read the guide
SEGA M metal distribution board enclosure Switchboards

How Many Ways? Sizing a Distribution Board: 12, 18, 24 or 36 Lines

The most common question about a distribution board is "how many lines?". Here is how to count the circuits, how much spare to keep, and which board size fits an apartment, a villa or a shop.

14 Nov 20266 min read
SIMOPRIME medium-voltage switchgear panel being wired at the SEGA M factory Switchboards

AIS vs GIS: Choosing Medium-Voltage Switchgear up to 24 kV

For 11 kV and 22 kV networks the choice is usually between air-insulated and gas-insulated switchgear. Here is how they differ, where each makes sense and which ratings to put in the specification.

14 Nov 20267 min read
SEGA M engineers testing a low-voltage switchboard before shipment Switchboards

ATS Panels: How Automatic Generator Changeover Works

When the mains fails, the ATS panel decides when to start the generator, when to switch and when to come back. Here is how it works and what to write in the specification.

14 Nov 20267 min read
SEGA M quality engineers testing a low-voltage switchboard before shipment Switchboards

Switchboard Factory Acceptance Test (FAT): A Practical Checklist

A factory acceptance test is the last chance to find a problem while it is cheap to fix. Here is what to check, in what order, and which documents to leave with.

12 Nov 20268 min read
Low-voltage switchboards and a wall-mounted distribution board in the SEGA M panel hall Switchboards

MDB, SMDB, DB and MCC: Distribution Boards Explained

MDB, SMDB, DB, MCC, ATS: the abbreviations on a single-line diagram describe a chain. Here is what each board does, what goes inside it and what to specify.

12 Nov 20267 min read
Busbar compartments of low-voltage switchboard sections at the SEGA M factory Switchboards

Switchboards in Hot Climates: Derating at 45 °C and 50 °C

The current rating on a switchboard is tied to an ambient temperature. In a hot plant room in the Gulf or the Sahel, the same board carries less. Here is how to specify it so it does not overheat.

12 Nov 20267 min read
Photometric testing of an LED street light in the SEGA M laboratory Lighting

Street Lighting Design: Road Classes, Pole Height and Spacing

Pole spacing is not a rule of thumb, it is the result of a road class, a luminaire's light distribution and a calculation. Here is how the pieces fit together.

12 Nov 20268 min read
SEGA M quality control engineers testing a low-voltage switchboard line-up in the factory Switchboards

IEC 61439 Explained: What a Type-Tested Switchboard Really Means

"Type tested" is still the phrase on most tender specs, but IEC 61439 speaks of design verification and routine verification. Here is what each means and what to ask your panel builder for.

6 Nov 20268 min read
Low-voltage switchboard sections with colour-coded busbars at the SEGA M factory Switchboards

Forms of Separation 1 to 4b Explained (IEC 61439-2)

Form 4b on the drawing adds cost, size and heat to a switchboard. Here is what each form of separation really protects against, and how to choose the one your project needs.

6 Nov 20267 min read
Metal enclosures moving through the powder-coating line at the SEGA M factory Enclosures & Testing

IP54, IP65, IP66, IP67: IP Ratings for Enclosures and Luminaires

An IP rating is two digits and a test behind each one. Here is what IP54, IP65, IP66 and IP67 really test, the mistakes buyers make, and how to choose for panels, enclosures and outdoor lighting.

6 Nov 20268 min read
SEGA M lab engineers preparing an LED street light for photometric testing on the goniophotometer Lighting

How to Choose an LED Street Light: A Buyer's Checklist

Comparing street lights by watts leads to bad projects. Here is the checklist our lighting engineers use: efficacy, optics, photometric files, CCT, IP and IK, surge protection and the documents to ask for.

6 Nov 20268 min read
SEGA M technician assembling busbar connections inside a low-voltage switchboard Buyer Guides

Switchboard RFQ Checklist: What to Send for a Fast, Accurate Quote

Most switchboard quotes are slow because the request is missing three or four facts. This checklist lists everything a panel builder needs, in the order engineers read it.

6 Nov 20266 min read
Forklift loading a SEGA M export shipment onto a truck at the factory in 10th of Ramadan City Export & Logistics

Importing Switchboards and LED Lighting from Egypt: An Importer's Guide

Egypt's trade agreements can cut or remove import duty on electrical products for buyers in Africa, the Arab world and Europe. Here is how it works, and the documents a shipment needs.

6 Nov 20267 min read

Have a project? Send us your SLD or BOQ.

Our engineers reply within 24 hours with a technical and commercial offer, for projects in Egypt and abroad.