Skip to main content
SIMOPRIME medium-voltage switchgear, built by SEGA M

Siemens SIMOPRIME Technology Partner

SIMOPRIME medium-voltage switchgear, built by SEGA M

Type-tested, metal-clad, air-insulated switchgear from 7.2 kV to 24 kV with withdrawable vacuum circuit-breakers. No SF6 gas, all switching behind a closed door.

Designed around the operator

Internal arc classified

IAC A FLR up to 40 kA for 1 s. Every switching operation is done with the high-voltage door closed.

Maintenance on a live switchboard

LSC2B service continuity with earthed metal shutters, so adjacent panels stay energised during work.

Vacuum, no SF6

Maintenance-free vacuum circuit-breakers. No SF6 gas and no heat-shrink insulation that ages.

Withdrawable trucks

Each circuit-breaker sits on its own truck and is exchanged without switching off the busbar.

Two versions, one family

RatingSIMOPRIME 12 kVSIMOPRIME A4 24 kV
Rated voltage12 kV24 kV
Power-frequency withstand voltage28 kV50 kV
Lightning impulse withstand voltage75 kV125 kV
Short-time withstand current (3 s)40 kA25 kA
Peak withstand current100 / 104 kA63 kA
Busbar currentup to 3,600 Aup to 2,500 A
Circuit-breaker panel width600 / 800 mm800 / 1,000 mm
Panel depth1,860 mm1,900 mm
Circuit-breakerwithdrawable vacuumwithdrawable vacuum, type 3AH

Panel types

  • Circuit-breaker panel
  • Contactor panel
  • Disconnecting panel
  • Metering panel
  • Bus sectionaliser
  • Bus riser
  • Load-break switch panel

Where it works

  • Power supply companies
  • Power stations
  • Cement industry
  • Iron and steel works
  • Mining industry
  • Chemical and petrochemical plants
  • Petroleum industry and pipelines
  • Emergency power supply
  • Textile, paper and food industries
SIMOPRIME panel with the vacuum circuit-breaker truck
SIMOPRIME panel with the vacuum circuit-breaker truck
Control and protection on the low-voltage compartment
Control and protection on the low-voltage compartment
Secondary wiring of a SIMOPRIME panel
Secondary wiring of a SIMOPRIME panel
SIMOPRIME line-up ready for testing
SIMOPRIME line-up ready for testing

From drawing to delivery

  1. Send your drawings

    Single-line diagram, BOQ or specification. A short description of the load is enough to start.

  2. Receive the offer

    Our export team replies within 24 hours and prepares the technical and commercial offer.

  3. Approve the drawings

    We send the layout drawings for your approval before production starts.

  4. Build and routine test

    Every board is built in our factory and routine tested before it leaves.

  5. Ship

    Lead time from stock items ready at once to about 6 weeks for larger projects.

Questions buyers ask us

Which voltages do you build?

SIMOPRIME from 7.2 kV to 17.5 kV (12 kV type) and SIMOPRIME A4 for 24 kV. We do not build switchgear above 24 kV.

Does SIMOPRIME use SF6?

No. It is air-insulated switchgear with vacuum circuit-breakers.

Is the switchgear type tested?

Yes, SIMOPRIME is type tested to IEC 62271-200 with internal arc classification.

Can you supply the low-voltage side too?

Yes. We build SIVACON S8 switchboards and SIBOARD distribution boards in the same factory, so one supplier covers the whole substation.

Send us your single-line diagram. We reply within 24 hours.

Send us your single-line diagram. We reply within 24 hours.

Tell us the project, the ratings and the destination country. Our export team prepares the offer and the drawings.

export@sega-m.com

Get a quote WhatsApp