Skip to main content
Siemens switchgear, built in Egypt by SEGA M

Siemens Advanced Partner

Siemens switchgear, built in Egypt by SEGA M

In our 30,000 m² factory in 10th of Ramadan City we build SIVACON S8 low-voltage switchboards, SIMOPRIME medium-voltage switchgear up to 24 kV and SIBOARD distribution boards, with Siemens components and a routine test on every board.

Three Siemens systems from one factory

One supplier for the main switchboard, the medium-voltage switchgear and the distribution boards, built to the Siemens design and tested in Egypt.

SIVACON S8

Low-voltage power distribution switchboard for main and sub-main distribution and motor control.

7,010 A
busbar current
150 kA
short-time withstand, 1 s
Form 4
internal separation
Explore SIVACON S8

SIMOPRIME

Type-tested, metal-clad medium-voltage switchgear with withdrawable vacuum circuit-breakers.

24 kV
highest rated voltage
40 kA
internal arc, 1 s
3,600 A
busbar current
Explore SIMOPRIME

SIBOARD

Design-verified distribution boards with Siemens components for sub-main and final distribution.

800 A
rated current
IEC 61439
parts 1, 2 and 3
100%
routine tested
Explore SIBOARD
Siemens switchgear, built in Egypt by SEGA M
30,000 m²
factory in 10th of Ramadan City
2004
the year SEGA M was founded
40+
years of engineering behind the company

What the partnership means for your project

A licensed Siemens design

Siemens grants SEGA M the right to manufacture and sell the design-verified SIVACON switchboard and type-tested SIMOPRIME switchgear. You receive the Siemens system, not a copy of it.

Siemens switching devices inside

Air circuit-breakers, moulded-case breakers, vacuum circuit-breakers and protection relays come from Siemens, so spare parts and service are available worldwide.

Tested before it ships

Every board passes a routine test in our factory. Our laboratory is accredited to ISO/IEC 17025 by EGAC, and the company is certified to ISO 9001, 14001 and 45001 by TÜV NORD.

Made in Egypt, shipped to your site

SEGA M has built electrical equipment since 2004 and exports to Libya, Iraq, Nigeria, Ghana, Côte d'Ivoire, Uganda and Rwanda.

Inside the factory

Sheet metal, coating, assembly and testing under one roof, so we control quality and lead time.

Laser cutting of enclosure parts
Laser cutting of enclosure parts
CNC bending
CNC bending
Electrostatic powder coating
Electrostatic powder coating
Control wiring in the panel hall
Control wiring in the panel hall

Switchboards from our factory power these projects

A selection of SEGA M low-voltage switchboard projects, Frame 2 (2,500 to 3,200 A) and Frame 3 (4,000 to 6,300 A).

  • Ain Shams University Obour Hospital
  • Ain Shams University Eldemerdash Hospital
  • New Saudi Embassy Chancellery, Cairo
  • WEPCO WAQ platform, oil and gas
  • Egyptian Railways stations renewal
  • Nile Badrawy Hospital
  • Pyramid Plateau Project
  • Monopharma factory, Badr City
  • Venus ceramic factory
  • Badr University
  • Samanoud Hospital
  • The Liver Institute

From drawing to delivery

  1. Send your drawings

    Single-line diagram, BOQ or specification. A short description of the load is enough to start.

  2. Receive the offer

    Our export team replies within 24 hours and prepares the technical and commercial offer.

  3. Approve the drawings

    We send the layout drawings for your approval before production starts.

  4. Build and routine test

    Every board is built in our factory and routine tested before it leaves.

  5. Ship

    Lead time from stock items ready at once to about 6 weeks for larger projects.

Questions buyers ask us

Is SEGA M an authorised Siemens partner?

Yes. SEGA M is a Siemens Advanced Partner: SIVACON Technology Partner (certificate LV0620-007), SIMOPRIME Technology Partner and Siemens SIBOARD Licensed Partner.

Which standards do the boards meet?

SIVACON S8 and SIBOARD are built to IEC 61439. SIMOPRIME switchgear is type tested to IEC 62271-200.

Do you supply outside Egypt?

Yes. Our export team quotes projects worldwide and has delivered to customers in Africa and the Middle East.

How long does an order take?

From stock items ready at once to about 6 weeks for larger switchboard projects, after drawing approval.

Send us your single-line diagram. We reply within 24 hours.

Send us your single-line diagram. We reply within 24 hours.

Tell us the project, the ratings and the destination country. Our export team prepares the offer and the drawings.

export@sega-m.com

Get a quote WhatsApp